Back to Results
First PageMeta Content
Water / Aquatic ecology / Kiryandongo District / Irrigation / Hydrology / Surface runoff / Erosion / Karuma / Wetland / Earth / Environment / Environmental soil science


KARUMA HPP (600 MW) _______________________________________________________ CHAPTER 8 IMPACT ASSESSMENT, EVALUATION AND MITIGATION 8.1 INTRODUCTION
Add to Reading List

Document Date: 2012-12-10 16:46:22


Open Document

File Size: 1,13 MB

Share Result on Facebook

Country

Uganda / /

Event

Environmental Issue / Natural Disaster / /

Facility

KHPP facility / /

IndustryTerm

food security / material extraction site / proposed weir site / mining / steep sloping river banks / main access tunnel portal / food stuffs / oil separators / weir site / Sand mining / dam site / sediment runoff control devices / bank / shelter and other infrastructure / /

NaturalFeature

Murchison Falls / Reduced river / Karuma Fall / Nile river / River Nile / /

Organization

IUCN / EPC / /

Position

Contractor / ranger / project environmental officer / /

URL

http /

SocialTag