PF

Results: 3946



#Item
9914 Earth and Planetary Science  PF Activity Report 2011 #29 Observation of the Structure of Adsorbed Water on a Mica Surface to Understand the Mechanism of Creeping Faults

4 Earth and Planetary Science PF Activity Report 2011 #29 Observation of the Structure of Adsorbed Water on a Mica Surface to Understand the Mechanism of Creeping Faults

Add to Reading List

Source URL: pfwww.kek.jp

Language: English - Date: 2012-12-24 21:42:11
9927 Imaging  PF Activity Report 2008 #26 High-Speed X-Ray Phase Imaging and Phase Tomography by Talbot Interferometry with White SR

7 Imaging PF Activity Report 2008 #26 High-Speed X-Ray Phase Imaging and Phase Tomography by Talbot Interferometry with White SR

Add to Reading List

Source URL: pfwww.kek.jp

Language: English - Date: 2010-02-04 02:10:02
9934 Earth Science  PF Activity Report 2010 #28 Structural Change in Hydrous Magma in the Earth’s Asthenosphere

4 Earth Science PF Activity Report 2010 #28 Structural Change in Hydrous Magma in the Earth’s Asthenosphere

Add to Reading List

Source URL: pfwww.kek.jp

Language: English - Date: 2012-03-08 04:01:08
994ALLGEMEINE GESCHÄFTSBEDINGUNGEN Christian Kreß – SARASTRO-STAUDEN I. Geltungsbereich Diese Allgemeinen Geschäftsbedingungen gelten für jeden Nutzer des auf der Website www.sarastro-stauden.com betriebenen online Pf

ALLGEMEINE GESCHÄFTSBEDINGUNGEN Christian Kreß – SARASTRO-STAUDEN I. Geltungsbereich Diese Allgemeinen Geschäftsbedingungen gelten für jeden Nutzer des auf der Website www.sarastro-stauden.com betriebenen online Pf

Add to Reading List

Source URL: www.sarastro-stauden.com

Language: German - Date: 2014-09-24 03:45:05
    995PF Activity Report 2007 #25  5 International Collaboration The PF has maintained an international collaboration program with the Australian Nuclear Science and Technology Organization (ANSTO) sinceThe Australian N

    PF Activity Report 2007 #25 5 International Collaboration The PF has maintained an international collaboration program with the Australian Nuclear Science and Technology Organization (ANSTO) sinceThe Australian N

    Add to Reading List

    Source URL: pfwww.kek.jp

    Language: English - Date: 2010-01-05 10:35:48
    996PF Activity Report 2011 #29  1 Newly Developed Experimental Facilities 1-1 Overview Since 2005, we have carried out the beamline refurbishment program based on a well-defined beamline strategy and the areas of excellence

    PF Activity Report 2011 #29 1 Newly Developed Experimental Facilities 1-1 Overview Since 2005, we have carried out the beamline refurbishment program based on a well-defined beamline strategy and the areas of excellence

    Add to Reading List

    Source URL: pfwww.kek.jp

    Language: English - Date: 2012-12-24 21:42:15
    9971 Outline of the Accelerators Two electron storage rings, the PF ring and the PFAR, as dedicated light sources were stably operated at the Photon Factory. The KEK linear accelerator with a maximum electron energy of 8 Ge

    1 Outline of the Accelerators Two electron storage rings, the PF ring and the PFAR, as dedicated light sources were stably operated at the Photon Factory. The KEK linear accelerator with a maximum electron energy of 8 Ge

    Add to Reading List

    Source URL: pfwww.kek.jp

    Language: English - Date: 2013-12-19 23:32:17
    998PF Activity Report 2012 #Theses Lists of doctoral theses, which were written based on the PF experiments. Doctor of Science	 AHMED, Naveed (Chiba Univ. )

    PF Activity Report 2012 #Theses Lists of doctoral theses, which were written based on the PF experiments. Doctor of Science AHMED, Naveed (Chiba Univ. )

    Add to Reading List

    Source URL: pfwww.kek.jp

    Language: English - Date: 2014-01-28 19:39:06
    9995 Structural Biology  PF Activity Report 2007 #25 Structural Analysis of the IL-15/IL-15Rα Complex antigen presenting cell

    5 Structural Biology PF Activity Report 2007 #25 Structural Analysis of the IL-15/IL-15Rα Complex antigen presenting cell

    Add to Reading List

    Source URL: pfwww.kek.jp

    Language: English - Date: 2010-01-05 10:35:45
    10004 PF-AR 4-1 Summary of Machine Operation The operation statistics for FY2003 are summarized in Table 1. The total operation time increased greatly to 5,400 hours from 4,667 hours in FY2002 (Fig. 1). Although failure time

    4 PF-AR 4-1 Summary of Machine Operation The operation statistics for FY2003 are summarized in Table 1. The total operation time increased greatly to 5,400 hours from 4,667 hours in FY2002 (Fig. 1). Although failure time

    Add to Reading List

    Source URL: pfwww.kek.jp

    Language: English - Date: 2010-01-05 10:30:46