Soil contamination / Aquifers / Water pollution / Environmental chemistry / Permeable reactive barrier / In situ chemical oxidation / Environmental remediation / Trichloroethylene / Electrical resistance heating remediation / Environment / Pollution / Earth


MarchFORMER WASTE CONTROL SITE, BELLEVUE, WA Stakeholder Update Meeting
Add to Reading List

Document Date: 2009-03-25 08:17:52


Open Document

File Size: 1,26 MB

Share Result on Facebook

City

BELLEVUE / /

Company

ENSR Australia Pty Ltd / Landcorp / URS / Golder Associates Pty Ltd / /

Country

Germany / /

Event

Product Issues / Environmental Issue / Man-Made Disaster / /

Facility

Waste Control facility / /

IndustryTerm

greenhouse gas emissions / groundwater treatment technology / active remedial technologies / chemical oxidation / active technology / chemical injection treatments / passive technology / waste chemical/oil recycling / chemical composition / granular iron products / energy requirements / minute gas samples / preferred technology / well established technology / mechanical systems / granular iron product / chemicals / surface infrastructure / drummed waste chemicals / high-tech tools / /

NaturalFeature

Helena River / /

Organization

Bellevue Community Consultation Committee / WA Environmental Protection Authority / Department of Environment and Conservation / Department of Environment and Conservation Level / /

Product

soils / sites experts / soil source area / Sites Auditor / Groundwater Figure / Groundwater / Site Auditor / /