<--- Back to Details
First PageDocument Content
Aerodynamics / Expansion tunnel / Compressible flow / Shock wave / Hypersonic speed / Fluid dynamics / Atmospheric entry / Gas / Enthalpy / Hypervelocity / Plasma
Date: 2015-10-06 17:49:29
Aerodynamics
Expansion tunnel
Compressible flow
Shock wave
Hypersonic speed
Fluid dynamics
Atmospheric entry
Gas
Enthalpy
Hypervelocity
Plasma

PROGRESS REPORT PROGRESS REPORT Extending Caltech’s Investment in Space Research by Joanna Austin, Professor of Aerospace

Add to Reading List

Source URL: eas.caltech.edu

Download Document from Source Website

File Size: 241,23 KB

Share Document on Facebook

Similar Documents

PROGRESS REPORT  PROGRESS REPORT Extending Caltech’s Investment in Space Research by Joanna Austin, Professor of Aerospace

PROGRESS REPORT PROGRESS REPORT Extending Caltech’s Investment in Space Research by Joanna Austin, Professor of Aerospace

DocID: 1oyjX - View Document

PROGRESS REPORT  PROGRESS REPORT Extending Caltech’s Investment in Space Research by Joanna Austin, Professor of Aerospace

PROGRESS REPORT PROGRESS REPORT Extending Caltech’s Investment in Space Research by Joanna Austin, Professor of Aerospace

DocID: 1kv1O - View Document

Carcassonne: The Tunnel Expansion (spielboxPreparation The four land tiles are shuffled in with those from the basic game. Each player takes the tunnel chips matching his color. (With two players, each uses thre

Carcassonne: The Tunnel Expansion (spielboxPreparation The four land tiles are shuffled in with those from the basic game. Each player takes the tunnel chips matching his color. (With two players, each uses thre

DocID: 1fyUt - View Document

$4B for 4 BART stations OR $2B for 100 ATN stations? The $4000M (million) price tag of burrowing a tunnel under San Jose for BART is too costly financially, and draws resources away from other transit options. The projec

$4B for 4 BART stations OR $2B for 100 ATN stations? The $4000M (million) price tag of burrowing a tunnel under San Jose for BART is too costly financially, and draws resources away from other transit options. The projec

DocID: 13C8b - View Document

Microsoft Word - EJSR_VOL_30_ISSUE_1.Doc

Microsoft Word - EJSR_VOL_30_ISSUE_1.Doc

DocID: RoEZ - View Document