Diverging diamond interchange / Single-point urban interchange / Cloverleaf interchange / Partial cloverleaf interchange / Stoney Trail / Arroyo Seco Parkway / Road transport / Land transport / Roads in Canada


Microsoft Word - Chapter 4 - State Avenue Corridor Improvements.docx
Add to Reading List

Document Date: 2014-06-22 16:24:46


Open Document

File Size: 1,81 MB

Share Result on Facebook

Company

Public Utilities / /

Currency

USD / /

EntertainmentAwardEvent

the southbound / /

Facility

Kansas Speedway complex / Diverging Diamond Interchange / DDI interchange / Interchange Improvement Review / Kansas Speedway / Street interchange / Single Point Urban Interchange / Standard Diamond Interchange / SPUI interchange / /

IndustryTerm

project design engineering services / underground duct bank relocation costs / electrical duct bank / travel demand model analysis / construction observation services / duct bank / longer travel paths / retail events / retail / peak commuter travel periods / traffic engineering analysis tool / longer travel path diversions / interchange systems / duct bank accounts / travel demand model / peak travel periods / /

Organization

Electrical Department / KDOT / Service for Standard Diamond Interchange Design Year / Service for Single Point Urban Interchange / Service for Single Point Urban Interchange Design Year / pre-98th Street / Service for No Build Design Year / Unified Government / developed using KDOT / /

Position

normal weekday PM / existing weekday PM / driver / weekday PM / contractor / future weekday PM / Village West Parkway Design Year2040 PM / /

Product

K-7 / /

Technology

simulation / /

SocialTag