Back to Results
First PageMeta Content
Lockheed Martin / Austal / Government procurement in the United States / Marinette Marine / Federal Acquisition Regulation / Global Combat Ship / USS Independence / USS Freedom / Watercraft / Trimarans / Littoral combat ship


GAO[removed], LITTORAL COMBAT SHIP: Navy Complied with Regulations in Accepting Two Lead Ships, but Quality Problems Persisted after Delivery
Add to Reading List

Document Date: 2014-09-25 12:21:15


Open Document

File Size: 1,26 MB

Share Result on Facebook

City

Marinette / Washington / DC / Washington / D.C. / Mobile / /

Company

LCS / Lockheed Martin / Survey / Inspection / The Navy / Survey Littoral Combat Ship Naval Sea Systems / General Dynamics / /

Country

United States / /

Currency

USD / /

/

Event

M&A / Product Issues / /

IndustryTerm

prime contractor / steel hull / contractor solutions / anti-submarine warfare systems / recovery systems / respective contractor / control systems / certain core combat systems / mission systems / /

NaturalFeature

Great Lakes / /

Organization

Program Office / Survey Littoral Combat Ship Naval Sea Systems Command Office / U.S. government / Navy / Congress / SUPSHIP / Navy Navy / Department of Defense / DOD FAR INSURV LCS NAVSEA OPNAVINST RDT&E SCN SUPSHIP TSM Acceptance Trials Builder’s Trials Department of Defense Federal Acquisition Regulation Supplement Department of Defense Federal Acquisition Regulation Navy Board of Inspection / /

Person

Michele Mackin / /

/

Position

Secretary of Defense / Secretary / Chief / Supervisor / contractor / Governor / Assistant General Counsel for Research / prime contractor / authorized representative / representative / respective contractor / /

Product

conditions / Condition / /

ProgrammingLanguage

DC / /

ProvinceOrState

Wisconsin / Alabama / /

SocialTag