Appropriate technology / Environmental technology / Low-carbon economy / Renewable energy / Technological change / Demand response / Power station / National Grid / Electricity sector in Iraq / Energy / Technology / Electric power


backbone to Power Delivery Acknowledgement We acknowledge the support of the following institutions in the write up of the 2013 Electricity Supply Plan: • Volta River Authority (VRA)
Add to Reading List

Document Date: 2014-11-10 07:15:46


Open Document

File Size: 1,22 MB

Share Result on Facebook

City

Akuse Township / /

Company

Ghana Grid Company Limited / Takoradi International Company / Sentuo Steel / Volta Hotel Savana Cement (Buipe) Sentuo Steel / RENEWABLE ENERGY / Enclave Power Company / Electric Corporation / Volta Aluminum Company / Northern Electricity Distribution Company / /

Country

Burkina Faso / Benin / Togo / Nigeria / Ghana / /

Currency

USD / /

Facility

KPONG HYDRO PLANT / Sunon Asogli Power Plant / Spot Loads I. Newmont New Abirem Mine / Atebubu substation / IMPACT OF BUI HYDRO PLANT / CENIT Thermal Power Plant / BUI HYDRO PLANT / New mine / AKOSOMBO HYDRO PLANT / MINES RESERVE POWER PLANT / CENIT THERMAL PLANT / VRA’s Solar PV plant / /

IndustryTerm

bank loan / thermal energy generation / past decade electricity demand / expected energy consumption / actual energy consumption / transmission network / electricity generation / erratic gas supply / year increasing electricity demand / sufficient energy generation / energy sector / short‐term energy / supply electricity / energy / /

Organization

Government of Ghana and the China International Water / Bui Power Authority / Volta River Authority / Ministry of Energy / /

Person

Mim / /

Position

EXECUTIVE / /