Smoke dampers

Results: 92



#Item
1secontrols.com  Case Study Powered Smoke Shaft Ventilation System for a Residential Development

secontrols.com Case Study Powered Smoke Shaft Ventilation System for a Residential Development

Add to Reading List

Source URL: www.secontrols.co.za

Language: English - Date: 2011-12-23 05:21:36
2Instationary CFD Simulations and Smoke Tests for the Design Check of the Fire Ventilation in the Branisko Tunnel Martin Ilg, Petr Pospisil, Dr. Rune Brandt (HBI Haerter Ltd., Zurich, Switzerland) Abstract The 4975 m long

Instationary CFD Simulations and Smoke Tests for the Design Check of the Fire Ventilation in the Branisko Tunnel Martin Ilg, Petr Pospisil, Dr. Rune Brandt (HBI Haerter Ltd., Zurich, Switzerland) Abstract The 4975 m long

Add to Reading List

Source URL: www.hbi.ch

Language: English - Date: 2014-11-17 08:51:37
3Colt ventilation systems for car parks, loading bays and service areas “Maintaining air quality while satisfying safety requirements is a key challenge for car park

Colt ventilation systems for car parks, loading bays and service areas “Maintaining air quality while satisfying safety requirements is a key challenge for car park

Add to Reading List

Source URL: www.coltgroup.com

Language: English - Date: 2014-09-30 10:48:34
4Commercial Plan submittal Requirements:  The City of Jamestown Inspection department will receive all plans and give one set each to the Engineering and Fire  Departments.     Inspection and 

Commercial Plan submittal Requirements:  The City of Jamestown Inspection department will receive all plans and give one set each to the Engineering and Fire  Departments.     Inspection and 

Add to Reading List

Source URL: www.jamestownnd.org

Language: English - Date: 2013-03-27 16:43:55
5National Joint Powers Alliance #SGL of Tennesee SWC # 172, Edison Contract #45116 State  Customer Name:

National Joint Powers Alliance #SGL of Tennesee SWC # 172, Edison Contract #45116 State Customer Name:

Add to Reading List

Source URL: tn.gov

Language: English - Date: 2015-03-23 13:27:25
6When Professional Design is required for New Buildings:  1. Project includes Group A‐E‐I‐H occupancies or R occupancy not built under IRC.    2. Project is 10,000 sq. ft. or more and no

When Professional Design is required for New Buildings:  1. Project includes Group A‐E‐I‐H occupancies or R occupancy not built under IRC.    2. Project is 10,000 sq. ft. or more and no

Add to Reading List

Source URL: www.jamestownnd.org

Language: English - Date: 2013-03-27 16:43:29
7Microsoft Word - PLANS SUBMITTAL CHECKLIST 2015.docx

Microsoft Word - PLANS SUBMITTAL CHECKLIST 2015.docx

Add to Reading List

Source URL: fire.nv.gov

Language: English - Date: 2015-01-21 18:06:09
8Laboratory Methods for Testing Actuators AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL INC.

Laboratory Methods for Testing Actuators AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL INC.

Add to Reading List

Source URL: www.amca.org

Language: English - Date: 2015-01-16 14:16:46
9 Additional items of equipment included  Options for diagnostic procedures or remote monitoring  Change in style of tables  Inclusion of “SURVEYS”  More comprehensive documents required

 Additional items of equipment included  Options for diagnostic procedures or remote monitoring  Change in style of tables  Inclusion of “SURVEYS”  More comprehensive documents required

Add to Reading List

Source URL: www.fireserviceprofessionals.com.au

Language: English - Date: 2014-10-08 01:25:46
10Methods of Testing Heavy Duty Dampers for Rating AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL INC.

Methods of Testing Heavy Duty Dampers for Rating AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL INC.

Add to Reading List

Source URL: www.amca.org

Language: English - Date: 2015-01-20 11:21:19