Tieback

Results: 22



#Item
1WORLD’S LARGEST SUBSEA EVENT FOR 16 YEARS  SUBSEATIEBACKFORUM.COM Hosted by:  MARCH 22-24, 2016 • HENRY B. GONZALEZ CONVENTION CENTER • SAN ANTONIO, TX

WORLD’S LARGEST SUBSEA EVENT FOR 16 YEARS SUBSEATIEBACKFORUM.COM Hosted by: MARCH 22-24, 2016 • HENRY B. GONZALEZ CONVENTION CENTER • SAN ANTONIO, TX

Add to Reading List

Source URL: www.subseatiebackforum.com

Language: English - Date: 2016-07-14 17:34:57
2Deepwater Horizon Study Group Working Paper – January 2011 Summary of Mistakes and Omissions on Macondo Well Gary L. Marsh 1. Running the production casing as tapered all-in-one rather than liner and tieback.

Deepwater Horizon Study Group Working Paper – January 2011 Summary of Mistakes and Omissions on Macondo Well Gary L. Marsh 1. Running the production casing as tapered all-in-one rather than liner and tieback.

Add to Reading List

Source URL: ccrm.berkeley.edu

- Date: 2011-02-14 10:59:46
    3Subsea Tieback Forum & ExhibitionSCHEDULE OF EVENTS *subject to change Monday, March 21 3:00 PM - 5:00 PM 8:00 AM - 8:00 PM

    Subsea Tieback Forum & ExhibitionSCHEDULE OF EVENTS *subject to change Monday, March 21 3:00 PM - 5:00 PM 8:00 AM - 8:00 PM

    Add to Reading List

    Source URL: www.subseatiebackforum.com

    Language: English - Date: 2015-05-13 10:03:38
      4Dua Tie-Back Development EPCI  Operator Client Location Water Depth

      Dua Tie-Back Development EPCI Operator Client Location Water Depth

      Add to Reading List

      Source URL: www.emas.com

      Language: English - Date: 2013-12-10 14:12:15
      5Project: Client: Engineer: Contractor: Location:

      Project: Client: Engineer: Contractor: Location:

      Add to Reading List

      Source URL: d6cbwp89cp4qo.cloudfront.net

      Language: English - Date: 2014-08-13 09:06:26
      6Microsoft Word[removed]Newtown Creek - Overview.doc

      Microsoft Word[removed]Newtown Creek - Overview.doc

      Add to Reading List

      Source URL: www.mrce.com

      Language: English - Date: 2007-02-22 07:58:36
      7Figure SG1-CD1 - Stream Segment 1 and 2 Tieback Levee Concept

      Figure SG1-CD1 - Stream Segment 1 and 2 Tieback Levee Concept

      Add to Reading List

      Source URL: lincoln.ne.gov

      - Date: 2009-04-13 15:24:49
        81 3’-6

        1 3’-6" (min.) Fence or Railing 3’-0" min.

        Add to Reading List

        Source URL: www.iowadot.gov

        Language: English - Date: 2013-09-03 11:18:48
        9Section[removed]Modular Block Retaining Wall[removed]DESCRIPTION. Furnish and install modular block retaining wall units, wall fill, and granular backfill material to the lines and grades shown in the contract documents. M

        Section[removed]Modular Block Retaining Wall[removed]DESCRIPTION. Furnish and install modular block retaining wall units, wall fill, and granular backfill material to the lines and grades shown in the contract documents. M

        Add to Reading List

        Source URL: www.iowadot.gov

        Language: English - Date: 2013-09-03 11:14:40
        10ATLANTIC YARDS CONSTRUCTION UPDATE

        ATLANTIC YARDS CONSTRUCTION UPDATE

        Add to Reading List

        Source URL: esd.ny.gov

        Language: English - Date: 2014-01-08 10:02:31