1[removed]Transmission Lines The width of the right-of-way for the Construction Power line will be 60 m. A 265-m width will be required for the four Unit Transmission Lines between the Keeyask Generating Station and the

[removed]Transmission Lines The width of the right-of-way for the Construction Power line will be 60 m. A 265-m width will be required for the four Unit Transmission Lines between the Keeyask Generating Station and the